CDPH has successfully implemented over 4,000 campsite construction services in more than 100 countries.
EPC Solution Services For Engineering Campsites Include: Campsite Planning, Nine System Design, Nine System Material Production And Procurement, Logistics Transportation, On-Site Construction, Operation And Maintenance.
Country: Iraq Project Industry: Energy Building Area: 63,567 square meters Construction Period: 2021~2022 Main Points in Consideration: Big production capacity of detachable container houses. The shipping cost is fluctuating frequently but...
Project Name: Russia Copper Mining Project Country: Russia Project Industry: Mining Building Area: 3916.41 square meters Construction Period: 2021 Main Points in Consideration: The project area belongs to the tundra and...
Country: Mexico Project Industry: Mining Building Area: 3,022 square meters Construction Period: 2020 Main Points in Consideration: Combining American and Chinese standard design in electrical system. Tight schedule allowing delivery in batches. Pro...
Country: Somalia Project Industry: Military Building Area: 580 square meters Construction Period: 2024 Main Points in Consideration: No crane on site, need to consider full manual installation. The houses are scattered in different areas, need to co...
Country: India Project Industry: Manufacturing industry Building Area: 707 square meters Construction Period: 2018 Main Points in Consideration: Fast installation and nice appearance. Anti-corrosion should be considered due to humid air. P...
Country: Somalia Project Industry: Construction Building Area: 2,970 square meters Construction Period: 2017 Main Points in Consideration: Buildings are along the coast, need to consider the problem of anti-corrosion. The trading company i...
Country: Papua New Guinea Project Industry: Manufacturing industry Building Area: 4006 square meters Construction Period: 2017 Main Points in Consideration: The selection of the house type is according to the local climatic conditions...
Country: India Project Industry: Construction Building Area: 50,000 square meters Construction Period: 2011~2014 Main Points in Consideration: India project with high temperature and humid air all year round. The houses require fast installation and...
Country: Lesotho Project Industry: Construction Building Area: 10768 square meters Construction Period: 2023 Main Points in Consideration: The project has a variety of product types, including villas, H-beams, and ZA houses. The local climate belongs...
国家:印度尼西亚 项目行业:采矿业 建筑面积:18,659平方米 建设周期:2021年 主要考虑因素:本项目所有建筑均采用轻钢结构别墅系统住宅,设计寿命为50年,耐火等级为II级,安全等级为II级。地震烈度:7级(地震加速度0.15g)。 项目简介:本项目位于印度尼西亚北马鲁古省哈马赫拉岛中部地区的韦达湾工业园(Weda Bay - IWIP)。项目地处特尔纳特岛市辖区内,位于其西北约75公里处。地势南低北高,南临大海,海水清澈明亮,沙滩坡度陡峭。年平均降水量为2671...
Country: Indonesia Project Industry: Construction Building Area: 10000 square meters Construction Period: 2023-2024 Main Points in Consideration: 1. Build a four-floor container type dormitory on a steel structure (requi...
Country: Ethiopia Project Industry: Mining Building Area: 1,338 square meters Construction Period: 2012 and 2023 Main Points in Consideration: The houses require higher standard for thermal insulation. Eth...
CDPH manufactures and sells various types of modular house, Prefab house and Villa house. Wide range of products ensures us to provide suitable solution for each engineering camp.