CDPH has successfully implemented over 4,000 campsite construction services in more than 100 countries.
EPC Solution Services For Engineering Campsites Include: Campsite Planning, Nine System Design, Nine System Material Production And Procurement, Logistics Transportation, On-Site Construction, Operation And Maintenance.
The challenge of this project was that typical temporary container houses only meet the construction requirements for three stories or less, while this project required the construction of a four-story container dormitory on a steel structure foundation. After careful stress analysis, the company's technical department determined the final solution and provided the client with a qualified written stress calculation report.
Our on-site QHSE management and 24/7 responsiveness service embody the principle of "one project, one organization; one organization, one platform; one platform, one set of management tools," ultimately making each project a flagship project. This has earned us high praise and trust from our clients.
This project not only met the housing needs of the miners but also installed insulation materials, improving their living comfort. The project was successfully completed with only one supervisor and six installers on site.
Côte d'Ivoire - China Harbour Engineering Company Limited Côte d'Ivoire Abidjan Port Expansion Project.
Country:UAE Project Industry:Energy Building Area:56223 square meters Construction Period:2022 Main Points in Consideration:There are various types ofhouseproducts, includingdetachable container houses, H steel,ZMbuildingand ZAmodel.The implementat...
The camp is expected to accommodate 40,000 people. Chengdong provided the construction and comprehensive facilities for this project, integrating living quarters, offices, a hospital, and other ancillary functions, including water, electricity, ceilings, flooring, fire protection, furniture, appliances, bathroom fixtures, communications, and cabinets. The total building area of the camp is 280,000 square meters, comprising approximately 1,000 buildings.
Located in Xiji, Tongzhou, the project involves six companies, including those in Chengdong. The main construction of the first phase, comprising 34 buildings, was completed in just 30 days, shortening the construction period by more than 40% compared to conventional emergency projects.
Covering an area of 4,500 square meters, this project was installed by a team of experienced professional engineers and designers in strict accordance with national standards for permanent steel building structures, serving as a comprehensive validation of CDPH's modular temporary building products.
The H-beams, designed for prefabrication, have a maximum span of over 30 meters, enabling rapid assembly and construction, effectively shortening the project cycle and improving engineering efficiency.
Project Overview Area:Africa / Ecuador Room Type:Prefab House Field:Education Scenes:Classroom Time:2014year Project Features 1. The supporting school adopts the assembled single-slope room type for construction. The room type desig...
Project Name: Russia Copper Mining Project Country: Russia Project Industry: Mining Building Area: 3916.41 square meters Construction Period: 2021 Main Points in Consideration: The project area belongs to the tundra and...
This project not only met the urgent housing needs of 6,500 construction workers, but also demonstrated how integrated housing solutions can transform large-scale infrastructure development.