Country: Nigeria Project Industry: Energy Building Area: 103,485 square meters Construction Period: 2022~2023 Main Points in Consideration: Camp design, fast installation, anti-corrosion, fire-proof, long-term residential and bulk shi...
Contact Us
Country: Nigeria
Project Industry: Energy
Building Area: 103,485 square meters
Construction Period: 2022~2023

Main Points in Consideration: Camp design, fast installation, anti-corrosion, fire-proof, long-term residential and bulk shipment.
Project Overview: This project is a Nigerian natural gas project located on Bonny Island. The contract for the Nigerian Containerized Accommodation Camp Project was officially signed on December 27, 2021. The project covers a total area of 100,000 square meters, mainly including the design and supply of accommodation, office, kitchen, and restaurant facilities. The total project duration is 13 months, divided into three phases. The project owner is Nigeria LNG.
Contractor: Saipem & Daewoo, Subcontractor: Horatio Ltd