Beijing Chengdong International Modular Housing Corporation

COOPERATION & CONSULTING

Customer-centric, integrity-based
Email
Name
Company Name
Phone/WhatsApp
Application
Project Details or Requirement
0/1000
Covering 4,000+ Projects

Covering 4,000+ Projects

CDPH has successfully implemented over 4,000 campsite construction services in more than 100 countries.

Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing

Located in Xiji, Tongzhou, the project involves six companies, including those in Chengdong. The main construction of the first phase, comprising 34 buildings, was completed in just 30 days, shortening the construction period by more than 40% compared to conventional emergency projects.

Contact Us
Emergency Site Project for Major Events in Xiji, Tongzhou District, Beijing

Project Overview

Area:Asia / China

Room Type:Modular House

Field:Emergency and Events

Area:10000㎡-200000㎡

Scenes:Accommodation Medical

Time:2022year

Project Features

1.The project is located in Xiji, Tongzhou, where 6 enterprises, including Chengdong, and 8 major types of work are intersected. During the peak period, more than 200 construction personnel were invested to overcome complex coordination problems, and the main construction of 34 buildings in the first phase was completed in only 30 days, which is more than 40% shorter than the construction period of conventional emergency projects.

2. The project functions cover the emergency needs of the whole scene, and the support capacity can be tested digitally: 3,500 approved beds and 1,300 open beds are built according to the standard of Class I emergency shelters. The per capita effective shelter area is not less than 3.5 square meters, which can meet the emergency resettlement needs of more than 2,000 people for more than 30 days. For major events such as large-scale conferences and important competitions, it can respond to medical needs within 3 minutes and complete emergency response within 10 minutes.

3. From site layout to facility configuration, it strictly follows the "Building Technical Regulations for Modular Emergency Infectious Disease Hospital". The acceptance rate of modular components is 100%, and 100% of steel structure welds pass UT testing. Use data to build a strong safety bottom line.

  • DM_20260304091113_001.jpg
  • DM_20260304091113_002.jpg
  • DM_20260304091113_003.jpg
  • DM_20260304091113_004.jpg
  • DM_20260304091113_005.jpg
  • DM_20260304091113_006.jpg
Prev

None

All applications Next

Xiongan Builders' Home Project

Recommendation

Extreme Cold Environment

Extreme Cold Environment

Desert Environment

Desert Environment

Plateau Environment

Plateau Environment

Coastal Highly Corrosive Environment

Coastal Highly Corrosive Environment

Moudular Homes

Moudular Homes

Prefab House

Prefab House

Steel Structure

Steel Structure

Letin Room

Letin Room

Triangle House

Triangle House

Apple Cabin

Apple Cabin

emergency site project for major events in xiji tongzhou district beijing-0

COOPERATION & CONSULTING

Customer-centric, integrity-based
Email
Name
Company Name
Phone/WhatsApp
Application
Project Details or Requirement
0/1000

COOPERATION & CONSULTING

Customer-centric, integrity-based
Email
Name
Mobile
Company Name
WhatsApp
Country/Region
Application
Project Details or Requirement
0/1000