Country: Nigeria Project Industry: Energy Building Area: 103,485 square meters Construction Period: 2022~2023 Main Points in Consideration: Camp design, fast installation, anti-corrosion, fire-proof, long-term residential and bulk shi...
Contact UsCountry: Nigeria
Project Industry: Energy
Building Area: 103,485 square meters
Construction Period: 2022~2023
Main Points in Consideration: Camp design, fast installation, anti-corrosion, fire-proof, long-term residential and bulk shipment.
Project Introduction: This project is Nigeria Gas Project located in Bonny Island. The contract of Nigeria Packing Box Accommodation Camp Project was formally signed on December 27th, 2021, FOB amount USD 29,698,846. The main content is the design and supply of accommodation, office kitchen dining room, etc., of which contains totally 3,716 pieces of 6-meter container houses, 304 pieces of 12-meter container houses, and H-steel building 19,190 m2. The total construction period of 13 months, and the project was carried out in three batches. The owner of the project is Nigeria LNG, and the general contractors are Saipem, Daewoo DEC and Chiyoda Union. Up to now, this project is the largest project implemented by the Foreign Trade Department.
CDPH manufactures and sells various types of modular house, Prefab house and Villa house. Wide range of products ensures us to provide suitable solution for each engineering camp.