Country:UAE Project Industry:Energy Building Area:56223 square meters Construction Period:2022 Main Points in Consideration:There are various types ofhouseproducts, includingdetachable container houses, H steel,ZMbuildingand ZAmodel.The implementat...
Contact UsCountry:UAE
Project Industry:Energy
Building Area:56223 square meters
Construction Period:2022
Main Points in Consideration:There are various types ofhouseproducts, includingdetachable container houses, H steel,ZMbuildingand ZAmodel.The implementation time of the project is long,from 2022 to the beginning ofyear 2024.The local climatic conditions are harsh, and the requirements for windy and anti-corrosion on the island arestrict.
Project Introduction:The project owner ADNOC belongs to the Emirate of Abu Dhabi and is the largest national oil company in the UAE. This project is one of its many projects; After 8 months of repeated communication and material approval in the early stage of the project, the final plan was determined to focus on assembling boxes and using assembly rooms as supporting facilities; The project is located on a small island far from the mainland, with harsh climate conditions, strong sandstorms, high temperatures, and poor construction capabilities of on-site personnel. After nearly 2 years of guidance from our supervisors, the installation was finally completed perfectly, winning praise from customers and laying a solid foundation for opening up the UAE market.
CDPH manufactures and sells various types of modular house, Prefab house and Villa house. Wide range of products ensures us to provide suitable solution for each engineering camp.