Project Name: Russia Copper Mining Project Country: Russia Project Industry: Mining Building Area: 3916.41 square meters Construction Period: 2021 Main Points in Consideration: The project area belongs to the tundra and...
Contact UsProject Name: Russia Copper Mining Project
Country: Russia
Project Industry: Mining
Building Area: 3916.41 square meters
Construction Period: 2021
Main Points in Consideration: The project area belongs to the tundra and forest tundra climate zone, where forest cover still exists. The climatic conditions in this climate zone are extremely harsh. The absolute minimum temperature at the project site is -57.5°C and the absolute temperature is 33.5°C. The average duration of the frost period is 217 days.
Project Introduction: The project owner proposes to build a construction camp for 4,998 people for its copper project in the Chukotka Autonomous Okrug of the Republic of the Russian Federation. The construction camp will be completed in three phases. The scope of work consists of the supply of the main buildings, assembly design and technical services for the camp, which will be completed in three phases: In the first phase, the supply of building units for 1,230 people will be completed; Phase II: supply of 2,538 units for 2,538 persons; The third phase will consist of the supply of building units for 1,230 persons.
CDPH manufactures and sells various types of modular house, Prefab house and Villa house. Wide range of products ensures us to provide suitable solution for each engineering camp.