CDPH (HAINAN)

COOPERATION & CONSULTING

Customer-centric, integrity-based
Email
Name
Company Name
Phone/WhatsApp
Application
Project Details or Requirement
0/1000
Covering 4,000+ Projects

Covering 4,000+ Projects

CDPH has successfully implemented over 4,000 campsite construction services in more than 100 countries.

GEM Indonesia Dormitory Projects

The GEM Indonesia dormitory building project has a total installed area of ​​57,000 square meters. The dormitory building has 5 floors. The first floor is made of steel structure, and the second to fourth floors are made of container houses. The fifth floor has a drying area and a sloping roof.

Contact Us
GEM Indonesia Dormitory Projects

Country: Indonesia

Project Industry: Engineering Camp Project

Building Area: 57,000㎡

Product type: Container house \Steel Structure

Main Points in Consideration : 
1. The dormitory building has five floors. The first floor uses a steel structure, while floors two through four use container-style houses. The fifth floor has a drying area and a pitched roof.

2.The drying area roof uses polycarbonate panels. Other areas have steel frame roofs with red resin tiles.

3.Exterior color design: The container house frames are white, and all exterior wall panels are beige.

  • 微信图片_20231214083731.jpg
  • 微信图片_20231214083815.jpg
  • 微信图片_20231214084149.jpg
  • 微信图片_20231211164954.jpg

Project Introduction: 
1. Coordinate with factories and supply chains to ensure timely delivery and port access.

2. Add a washing machine drain at the entrance of the prefabricated bathroom to prevent leaks from affecting the room.

3. Seal the gap between the roof beams and floor beams with widened sealing strips to prevent rainwater from entering the roof.

4.Install wiring for wall sockets on the roof, running it through guide rails with centered holes to prevent wire wear.

5.Modify the sockets with multi-functional round holes for easier on-site use.

  • lADPJxRxYc1RXMnNC9DND8A_4032_3024.jpg
  • lADPJxDj4yiKrjTNC9DND8A_4032_3024.jpg
  • lADPKGXzYPMKw5nNC9DND8A_4032_3024.jpg
  • lADPJw1WZIPEXkPNC9DND8A_4032_3024.jpg
Prev

None

All applications Next

Hong Kong International Airport Temporary Warehouse Project

Recommendation

Extreme Cold Environment

Extreme Cold Environment

Desert Environment

Desert Environment

Plateau Environment

Plateau Environment

Coastal Highly Corrosive Environment

Coastal Highly Corrosive Environment

Moudular Homes

Moudular Homes

Prefab House

Prefab House

Steel Structure

Steel Structure

Letin Room

Letin Room

Triangle House

Triangle House

Apple Cabin

Apple Cabin

gem indonesia dormitory projects-0

COOPERATION & CONSULTING

Customer-centric, integrity-based
Email
Name
Company Name
Phone/WhatsApp
Application
Project Details or Requirement
0/1000

COOPERATION & CONSULTING

Customer-centric, integrity-based
Email
Name
Mobile
Company Name
WhatsApp
Country/Region
Application
Project Details or Requirement
0/1000