Beijing Chengdong International Modular Housing Corporation

COOPERATION & CONSULTING

Customer-centric, integrity-based
Email
Name
Company Name
Phone/WhatsApp
Application
Project Details or Requirement
0/1000
Covering 4,000+ Projects

Covering 4,000+ Projects

CDPH has successfully implemented over 4,000 campsite construction services in more than 100 countries.

Hong Kong International Airport Temporary Warehouse Project

The H-beams, designed for prefabrication, have a maximum span of over 30 meters, enabling rapid assembly and construction, effectively shortening the project cycle and improving engineering efficiency.

Contact Us
Hong Kong International Airport Temporary Warehouse Project

Area:Asia / china

Room Type:Steel Structure

Field:Engineering Camps

Area:4000-10000㎡

Scenes:Warehouse

Time:2023year

  • DM_20260304101008_001.jpg
  • DM_20260304101008_002.jpg
  • DM_20260304101008_003.jpg
  • DM_20260304101008_004.jpg
  • DM_20260304101008_005.jpg
  • DM_20260304101008_006.jpg

Project Features

1. Adopting H-shaped steel components with prefabricated production design, achieving rapid assembly and construction, effectively shortening the project cycle, and improving engineering efficiency.

2. The internal space layout of the warehouse is flexible and versatile, with a maximum span of over 30 meters, providing a spacious and well-ventilated working environment, significantly improving space utilization, creating optimal conditions for equipment installation and logistics management, and fully meeting the high standards of modern warehouse requirements.

Prev

None

All applications Next

Beijing 2022 Olympic Winter Games Functional Housing Project

Recommendation

Extreme Cold Environment

Extreme Cold Environment

Desert Environment

Desert Environment

Plateau Environment

Plateau Environment

Coastal Highly Corrosive Environment

Coastal Highly Corrosive Environment

Moudular Homes

Moudular Homes

Prefab House

Prefab House

Steel Structure

Steel Structure

Letin Room

Letin Room

Triangle House

Triangle House

Apple Cabin

Apple Cabin

hong kong international airport temporary warehouse project-0

COOPERATION & CONSULTING

Customer-centric, integrity-based
Email
Name
Company Name
Phone/WhatsApp
Application
Project Details or Requirement
0/1000

COOPERATION & CONSULTING

Customer-centric, integrity-based
Email
Name
Mobile
Company Name
WhatsApp
Country/Region
Application
Project Details or Requirement
0/1000